OPEN-SOURCE SITUATION REPORT · CONUS / MONTGOMERY, OHIO
240108Z SEP 26
Sep 23, 9:08 PM EDT
Last checked 0108Z
DTG/ 240108Z SEP 26 FM/ CONUS SITREP TO/ PUBLIC SUBJ/ CONUS AND MONTGOMERY, OHIO AOR, ALL SECTORS
BLUF/ NWS lists no active alerts for Montgomery, Ohio. PJM lists no open procedure for the AES Ohio / DAY zone. SWPC current scales are G0 S0 R0.
WATCH/ SWPC G0 S0 R0, below the G3/S3/R3 line · No open PJM procedure in AES Ohio / DAY
NEXT/ AUTO REFRESH ~5 MIN
Common operating picture. Conterminous United States. Pins are approximate.
Select a pin for the source reading at that point.
Pins are approximate operator locations, not service boundaries. Alert pins use a state centroid, not the warning polygon.
Checked Sep 23, 9:08 PM EDT
Last incident Time not provided by the source
All Systems Operational
Checked Sep 23, 9:08 PM EDT
Last incident Time not provided by the source
All Systems Operational
Checked Sep 23, 9:08 PM EDT
Last incident Sep 10, 5:20 PM EDT
No active incidents
Checked Sep 23, 9:08 PM EDT
Last incident Time not provided by the source
There are currently no active events. Use Azure Service Health to view other issues that may be impacting your services.
Checked Sep 23, 9:08 PM EDT
Last incident Sep 15, 6:27 AM EDT
Increased Error Rates (+1 more in the feed)
Checking this source…
Last updated Sep 2, 12:08 PM EDT · Checked Sep 23, 9:08 PM EDT
Window requested: 09-10-2026 to 09-24-2026 UTC. A posting older than 7 days with no cancel time is not labeled active.
No open posting in the AOR zone.
no cancel posted in 21 daysPost Contingency Local Load Relief Warning
A Post Contingency Local Load Relief Warning has been issued to maintain HARDY 138 KV *E01 at 127.0 KV in the FE(APS) for Transmission Contingency Control. Additional Comments: Post Contingency Switching available View Posting
Regions: FE-AP
Posted Sep 2, 12:08 PM EDT
View posting 105478CanceledNon-Market Post Contingency Local Load Relief Warn
A Non-Market Post Contingency Local Load Relief Warn has been issued to maintain MURPHYSV 69 KV *G01 at 63.5 KV in the EKPC for Transmission Contingency Control. Additional Comments: Load -No Generation or Switching available View Posting
Regions: EKPC
Posted Sep 21, 2:39 PM EDT
View posting 105538CanceledPost Contingency Local Load Relief Warning
A Post Contingency Local Load Relief Warning has been issued to maintain FLMINSBG 138 KV ND_4 at 127.0 KV in the EKPC for Transmission Contingency Control. Additional Comments: Load -No Generation or Switching available View Posting
Regions: EKPC
Posted Sep 21, 2:39 PM EDT
View posting 105539CanceledNon-Market Post Contingency Local Load Relief Warn
A Non-Market Post Contingency Local Load Relief Warn has been issued to maintain BARRENCO BNCO 161_69 XFR at 109.0 MVA in the EKPC for Transmission Contingency Control. Additional Comments: Post Contingency Switching available View Posting
Regions: EKPC
Posted Sep 15, 4:40 PM EDT
View posting 105512CanceledPost Contingency Local Load Relief Warning
A Post Contingency Local Load Relief Warning has been issued to maintain ADAMSAEP 138 KV *E08 at 127 KV in the AEP for Transmission Contingency Control. Additional Comments: Post Contingency Switching available View Posting
Regions: AEP
Posted Sep 15, 9:52 PM EDT
View posting 105519CanceledPost Contingency Local Load Relief Warning
A Post Contingency Local Load Relief Warning has been issued to maintain FOSTORIA-LALLENDO TIE at 1454.0 MVA in the AEP for Transmission Contingency Control. Additional Comments: Post Contingency Generation redispatch available View Posting
Regions: AEP, FE-ATSI
Posted Sep 17, 7:07 PM EDT
View posting 105537CanceledSpecial Notice
A Special Notice : DOE 202(c) No. 202-26-45 Applicability Additional Comments: PJM has received DOE 202(c) No. 202-26-45 which pertains to the usage of identified Specified Resources and directives to operate backup generators at large loads. In an effort to provide additional clarity, PJM is sending this notice regarding the operational applicability for Specified Resources under the DOE order. PJM has NOT identified a reliability need to utilize the Specified Resources identified in Exhibit A (Order No. 202-26-45 Resource List) starting on the 9/18 operating day through the end of the order on the 9/18 operating day. It is important to note that the order does not constitute a directive to operate at maximum output or full load. Exhibit A resources should still follow relevant PJM instructions for commitment and dispatch. Emergency system conditions are not expected to continue past 9/17. PJM will provide additional communication as needed on the applicability of DOE Order No. 202-26-45 for the effective duration of the order. View Posting
Regions: PJM-RTO
Posted Sep 17, 6:43 PM EDT
View posting 105536Last updated Sep 23, 9:05 PM EDT · Checked Sep 23, 9:08 PM EDT
Last updated Sep 23, 9:02 PM EDT · Checked Sep 23, 9:08 PM EDT
Estimated Kp, 1-minute product
2.33
Sep 23, 9:02 PM EDT
Planetary Kp, 3-hour product
1.67
Sep 23, 5:00 PM EDT
Checking this source…
Last updated Sep 21, 2026 · Checked Sep 23, 8:15 PM EDT
Ohio
None 100.00% · D0 0.00% · D1 0.00% · D2 0.00% · D3 0.00% · D4 0.00%
Last updated Sep 23, 9:08 PM EDT
No active alerts for Montgomery, Ohio.
Last updated Sep 23, 9:08 PM EDT
Declarations since Aug 24, 9:08 PM EDT. Filter: Ohio.
No declarations in this window.
EAMs go out many times a day. Message volume is not a threat indicator. This page lists what was logged; it does not decode or interpret messages.
USB 4724 6739 8992 11175 13200 15016
8992 and 11175 are the H24 primary frequencies. A row shows a frequency only when the log recorded one.
Checking this source…
MASTER MESSAGES (opens in a new tab)
Open master messages07
Planned feed. No source is connected, so this panel stays empty.
08
Planned feed. No source is connected, so this panel stays empty.
09
Planned feed. No source is connected, so this panel stays empty.